FLIGHT MANUAL

SEARCH

Search: Runways

16 articles for “Runways”

GATE B · INFRASTRUCTURE · PHASE 02

Runway lighting

Night lasts from 21:00 to 05:00. During those hours, take-offs and landings are only allowed on runways with lighting. Runway lighting is researched in the Airfield branch after th …

GATE B · INFRASTRUCTURE · PHASE 01

Runways

Grass, asphalt and concrete runways – lengths, weight limits and which aircraft need what.

GUIDE · PHASE 01

Beginner's guide

Your first hour – lay out a grass strip, put up the radio hut, welcome visitors and plan the asphalt runway.

GATE A · BUILDINGS · PHASE 02

Control tower

Tower levels, movements per hour and how many runways you may use at the same time.

GATE A · BUILDINGS · PHASE 01

Glider club

A separate grass strip, a winch and a clubhouse – gliding that runs independently of your main runway.

GATE D · FLIGHT OPS · PHASE 02

Night operations

What changes between 21:00 and 05:00 – lit runways, night mail, slower taxiing and quiet-night fast-forward.

GATE A · BUILDINGS · PHASE 01

Radio hut

The humble start of air traffic control – one radio operator, one runway, six movements per hour.

GATE B · INFRASTRUCTURE · PHASE 01

Taxiways

Mown paths, asphalt and concrete taxiways link runways, stands and hangars – and route your traffic.

GATE F · STAFF · PHASE 02

Airport management

Post Slots Strength Controller 2 / 3 / 4 by tower level Dense approaches, multi-runway ops, weatherproof Ground operations Research Vehicle hall, Catering and cleaning Fast turnaro …

GATE A · BUILDINGS · PHASE 01

Box hangar

The forecourt must connect to a taxiway that leads to the runway. Tenants fly small single-engine aircraft that are happy on grass, so a mown path is enough. Keep the hangar away f …

GATE A · BUILDINGS · PHASE 03

Fire station

On a grass airfield the club members grab an extinguisher and that is that. Once airlines land with dozens or hundreds of passengers on board, a real airport needs rescue and firef …

GATE D · FLIGHT OPS · PHASE 02

Flight schedule

Below the timeline, the check lists every problem it finds: Overlaps. Two flights on the same stand at the same time. A stand counts as occupied for the ground time plus a short bu …

GATE E · ECONOMY · PHASE 02

Loans and finance

No. The career is balanced so that the path from grass field to regional airport works without a single loan, carried by operating income and goal grants. A loan is a tool to build …

GATE H · CO-OP · PHASE 01

Playing together

Split the work: one player on the terminal, one on runways and taxiways, one on the schedule. Agree on big purchases – the shared budget empties fast when two people build a tower …

GATE A · BUILDINGS · PHASE 02

Terminal

The terminal is built on a grid of 8 × 8 m cells. With the first research (Terminal, after the asphalt runway) your terminal may have up to six cells – just enough for an entrance, …

GATE D · FLIGHT OPS · PHASE 01

Weather station

Weather alternates between dry spells of 6 to 30 hours and showers of 1 to 4 hours; about a quarter of the showers are heavy rain. On average it rains roughly a tenth of the time. …